- Construction of Air Strip at Neyveli Lignite Corporation Limited.
- Repairs, Rehabilitation, Protective coatings and other works.
- Strengthening of Pedestals and Other Rehabilitation works in the Cooling Tower Stage – II of Thermal Power Station II.
- Painting and Other Rehabilitation works such as Cracks Repairing and Replacing of Stainless Steel Hand Rails, GI Ladders, Lightning Arresters and Medium Intensity Aviation Warning Lights for RCC Chimneys of unit 1 to 7 at Thermal Power Corporation Limited.
- Rehabilitation works in RCC Pressure Tunnel at Block no. 94 and Staircases of Cooling Towers of Stage I.
- Profile Correction and Strengthening of Road between B&C Plant and Thermal Power Station II using Hot Mix Plant, Paver, Vibrating Roller and Static Roller.
Name of Work:
Client:
NLC Neyveli